What we build

Six disciplines, one in-house team.

We focus on a narrow set of services so we can hold a high standard on every one of them. If it isn't on this list, we'll tell you who to call.

Kitchen Remodels

Custom cabinetry, stone fabrication, range hoods, and lighting design - built around how you actually cook.

  • Custom & semi-custom cabinetry
  • Stone & quartz fabrication
  • Appliance integration
  • Lighting design

Bathroom Remodels

From powder rooms to full primary-suite spas - waterproofing, tile, plumbing, and finish work done in-house.

  • Walk-in showers
  • Freestanding tubs
  • Heated floors
  • Custom vanities

Whole-Home Renovations

Floor-plan changes, structural work, and complete refinishes coordinated under one fixed contract.

  • Floor-plan reconfiguration
  • Structural openings
  • Finish refresh
  • Mechanical updates

Additions

Primary suite additions, kitchen bump-outs, and second-story builds permitted and managed end-to-end.

  • Primary suite additions
  • Kitchen bump-outs
  • Second-story builds
  • Permit & engineering

Outdoor Living

Covered patios, outdoor kitchens, and pergolas built to handle Colorado weather and entertain three seasons.

  • Covered patios
  • Outdoor kitchens
  • Pergolas
  • Fire features

Design & Drafting

Standalone design packages for homeowners who want measured drawings and a finish plan first.

  • Measured drawings
  • 3D renderings
  • Finish schedules
  • Bid-ready packages
Design to finish

As hands-on, or as hands-off, as you want to be.

Every FHR project is full-service design to finish. You decide how involved you want to be in the details — from picking every tile yourself to handing us the keys and letting our team be the think tank for the entire remodel.

Hands-on with you

You drive the selections. We curate the options, source the samples, and keep you on budget and on schedule while you make every call.

Guided design

We narrow the choices down to two or three that fit your style, budget, and the architecture of your home. You approve, we build.

Full think tank

Hand it to us. We design, source, and decide the whole remodel for you and present a finished home you didn't have to manage.

Your project, always in view

A private client dashboard for every project.

From the day we sign the contract, you get a secure login to your own project dashboard. No more chasing texts, scrolling through emails, or wondering what is happening this week. Open it on your phone or laptop and the answer is right there.

  • Make and approve selections (cabinets, tile, fixtures, finishes)
  • Read daily logs from the crew with photos from the job site
  • See the live schedule and upcoming milestones
  • Track upcoming payments and contract documents in one place
  • Message your project lead directly — no group texts
FHR client dashboard showing 3D floor plans, tasks, and project schedule
FHR client dashboard showing schedule, files & photos, and daily logs

“The dashboard alone is worth it. I always knew what was happening, what came next, and what we were spending — without having to ask.”

A recent FHR client
Full-scale 3D rendering of a kitchen remodel showing cabinets, island, and finishes
See it before we build it

Full-scale 3D renderings of your space.

Before a single cabinet is ordered, we model your remodel in 3D so you can walk through it from every angle. Cabinet style, counter color, flooring, lighting, range hood — you see the real thing, not a sketch. It is how we catch questions early and lock in decisions you will love on day one.

  • Photo-real materials — cabinet finish, stone, tile, flooring
  • Walk-around views of every elevation, plus overhead floor plan
  • Iterate on layout and finishes before anything is built
  • Shared inside your dashboard for easy review and approval
Fixed pricing, clear scope

One price, agreed up front — built around the level of remodel you actually want.

Most remodelers hand you a "ballpark" and let the number drift. We work from a defined scope and a fixed contract price, so the number you sign is the number you pay. To make that possible, every project lands in one of three levels — each with its own standards for layout, materials, cabinetry, and finishes.

Streamlined refresh

Elevated Essentials

A clean, modern update inside your existing footprint. Curated finishes, quartz tops, semi-custom cabinetry, and a fast, low-stress build.

Bath $25k – $45k
Kitchen $45k – $75k
Design-driven

Signature Remodel

Layout adjustments, upgraded materials, custom tile work, and a guided design process. The sweet spot for most of our clients.

Bath $45k – $75k
Kitchen $75k – $120k+
Fully bespoke

Luxury Custom

Full redesign, premium materials, fully custom cabinetry, and a white-glove design and build. For homeowners who want the very best.

Bath $75k+
Kitchen $120k+

What "fixed price" actually means.

Once your scope and selections are locked, design changes inside that scope don't add cost or trigger change orders — that's on us to plan correctly. The only time you'll see a change order is for genuinely unforeseen conditions: hidden rot, asbestos, failed substrate, or something the home itself reveals once we open a wall. When that happens, we document it, price it transparently, and you approve before we proceed.

Have a project that crosses categories?

Most of our work does. Tell us about it and we'll scope a single fixed contract.

Request an estimate